Edgewater Condos This Winter, Between One Tower Wave and the Next

This month, crews began demolishing Biscayne 21, a 13-story condominium on the bay just north of Margaret Pace Park. Its owners and Two Roads Development reached a settlement in September that ended litigation over the building's termination, which began in 2023. A total-demolition permit for 2121 North Bayshore Drive was issued on August 26, 2026, and the site is set to become EDITION Residences, Miami Edgewater, a 55-story, 185-residence tower designed by Arquitectonica.

Two miles of bayfront tell the rest of the story. One older building is coming down, one new tower has just been finished, and the next group is still years from move-in. For a buyer comparing Edgewater with Brickell or Downtown this winter, the result is easy to miss. The new towers that would compete with Edgewater's existing condos are either just delivered or still years out, and those existing condos are selling in a ZIP where buyers set more of the terms than they do in most of Miami-Dade.

The Third-Quarter Numbers Point Two Ways

Edgewater falls within ZIP code 33137, and the Q3 2026 ZIP-level report from Miami Realtors is the most recent official reading. It covers July through September 2026, was released October 16, and combines condos and townhouses. The ZIP also reaches beyond the bayfront toward the Design District.

Q3 2026 condos and townhouses 33137 Change vs. Q3 2025 Miami-Dade County
Closed sales 94 +10.6% 2,846
Median sale price $676,250 -16.5% $409,500
Average sale price $918,463 -29.1% $735,542
Median time to contract 116 days +73.1% 76 days
Share of original list price received 92.5% +1.8% 93.6%
New pending sales 86 +24.6% 3,011
Active inventory 530 -11.1% 11,706
Months of supply 15.9 -25.7% 12.3

Compared with the same quarter of 2025, closings in the third quarter of 2026 rose, new pending sales rose by about a quarter, and both active inventory and months of supply fell. Price and time moved the other way. The median and the average both dropped, and the typical listing took 116 days to go under contract, 40 days longer than the county median.

The price figures are partly about which units sold. Melo Group's Aria Reserve South Tower, a 383-unit building on the bay, received its temporary certificate of occupancy and began closings on August 19, 2025, which put a batch of brand-new bayfront sales into the year-ago quarter. The likeliest reason the average fell faster than the median, 29.1% against 16.5%, is that the third quarter of 2026 had fewer of those top-end new-tower closings to lift it. Total dollar volume in 33137 fell 21.6% to $86.3 million even as the number of sales rose.

So the ZIP did not lose a sixth of its value in a year. The third quarter of 2026 had fewer new-tower closings in the mix, and the listings that did sell took longer to go under contract and closed below their first asking price.

Where Edgewater Sits Against Its Neighbors

Edgewater's 15.9 months of supply in Q3 2026 is above the county's 12.3, but it is tighter than the two condo ZIPs to its south. Over the same quarter, Brickell's 33131 carried 17.9 months of supply and Downtown's 33132 carried 25.2. Sellers in all three received roughly the same share of their original list price, between 92.0% and 93.3%.

That puts Edgewater in an unusual position. Supply is shrinking faster here than in Brickell or Downtown. Edgewater added 237 new listings in the quarter, 11.6% fewer than a year earlier, and its months of supply fell by about a quarter. Even so, buyers here still take longer to commit and still get meaningful room below list. Our earlier comparison of Brickell and Downtown Miami as condo hubs covers the lifestyle side of that choice. The numbers say Edgewater belongs in the same conversation as a buyer's market that is firming faster than its neighbors.

The Delivery Just Behind Us

The second Aria Reserve tower changes the near-term picture. In April 2026, Florida YIMBY reported the North Tower nearly complete, with delivery anticipated in the second quarter. It received its temporary certificate of occupancy in October, and the 62-story complex at 725 Northeast 24th Street is now finished on both sides.

Any North Tower closings this fall will show up in the fourth-quarter numbers when they are released. Expect the same pattern as 2025 in reverse. A batch of new bayfront closings can push the 33137 median and average back up without any resale owner getting a better price. A buyer who sees a rebound in the next quarterly report should look at which buildings closed before reading it as a turn in the market.

Of the Edgewater projects below with a published schedule, none is set to finish before late 2027.

The Next Wave Is Two Different Products

The towers coming after Aria Reserve split into two products, aimed at different buyers and separated by millions of dollars.

Project Address Size Starting price Status and timing
Villa Miami 710 NE 29th Street 72 residences, 56 stories From $5.8M 37 of 56 floors in May 2026; late 2027 completion anticipated
EDITION Residences 2121 N Bayshore Drive 185 residences, 1,922 to 3,760 sq ft Not published Demolition of Biscayne 21 began November 2026
The Cove Residences 456 NE 29th Street 134 units, 40 stories In the $900,000s Broke ground March 2026; 2028 target
HQ Residences 422 NE 29th Street 229 units, 35 stories From $850,000 Planned
ELLE Residences 3618 NE 5th Avenue 189 units, roughly 450 to 845 sq ft Not published Planned; managed rental program advertised
Edge House Edgewater 608 furnished units In the $550,000s Vertical construction began July 2026; Q4 2028 anticipated

At the top are full- and half-floor bayfront residences. Villa Miami, developed by Terra and One Thousand Group, is priced from $5.8 million, about $1,800 per square foot at entry. Florida YIMBY reported in May that the tower had reached 37 of its 56 floors, with completion anticipated in late 2027. EDITION will replace Biscayne 21 with residences of 1,922 to 3,760 square feet.

The other product is furnished, smaller and built around renting. Edge House plans 608 furnished units priced from the $550,000s. ELLE Residences, a 26-story building from Vertical Developments, plans 189 fully finished units of roughly 450 to 845 square feet, and its own site advertises a managed rental program for when owners are away. Vida Residences at 410 NE 35th Terrace, a nine-story building of furnished studios to four-bedrooms, states on its developer site that short-term rentals are permitted.

The Cove and HQ Residences sit between those two products on price, with starting figures in the $850,000 to $900,000s range.

Each of these projects has its own timeline, and none of them gives keys to a buyer this winter. Edge House is anticipated in the fourth quarter of 2028. The first of the bayfront residences is still about a year away.

What That Means for the Unit You Can Buy Now

A buyer who wants to live or rent in Edgewater during the 2026–27 season is choosing among buildings that already stand. Across 33137 in the third quarter of 2026, condo and townhouse listings took a median of 116 days to go under contract, and sellers received 92.5% of their original asking price. Cash made up 44 of the ZIP's 94 closings in Q3 2026, so a financed offer here is competing with a large share of buyers who can close quickly.

The pipeline matters because it fixes what a resale unit will compete with when you eventually sell it. An owner of a mid-priced resale condo in 2028 will be listing against a few hundred furnished, rental-ready units priced from the $550,000s at Edge House alone. An owner of a large bayfront resale residence will be listing against Villa Miami and EDITION, new product that will set the reference prices for the top of Edgewater. How long you plan to hold, and whether you plan to rent, decides which of those two future markets your purchase belongs to. Rental rules vary by building and by condo association, so confirm them building by building before you treat a unit as a rental.

For investors weighing rental-oriented product against a traditional resale unit, our overview of Miami neighborhoods to watch for short-term rentals and our short-term rental services cover the operating side. For everyday life on this stretch of the bay, our Edgewater weekend guide covers Legion Park's Saturday market and Morningside's waterfront parks.

Quick Answers

Did Edgewater condo prices drop in 2026? In Q3 2026, the 33137 median was $676,250, 16.5% below Q3 2025. Part of that gap reflects Aria Reserve South Tower closings in the year-ago quarter, which began in August 2025.

Is Edgewater a buyer's market right now? In Q3 2026, 33137 had 15.9 months of supply, a median of 116 days to contract, and sellers received 92.5% of original list price. All three readings are softer than the county's.

When does the next big group of Edgewater towers deliver? Villa Miami is anticipated for late 2027. The Cove targets 2028, and Edge House is anticipated in the fourth quarter of 2028.

If you are weighing an Edgewater resale unit against a reservation in one of the 2027–2028 towers, Isabela Faria can compare the buildings side by side, including recent closings, how long similar units have taken to sell, and what each building allows for rentals, in English, Portuguese or Spanish. Schedule a Consultation to go through the Edgewater buildings on your list.

Work With Isabela

Whether buying or selling, Isabela delivers service beyond comparison. Isabela works closely with each of her clients to find their ultimate property in the most premier locations, and secures the best deal. When listing a property, Isabela maximizes each property’s market value with her unmatched marketing strategy.